Cutting and edge processing of panel materials: 11–13 working days
Parts from standard tabletop surfaces: 9–11 working days
Parts from standard tabletop surfaces without edge processing: 1–3 hours
Parts edged with high-pressure laminate: 10–15 working days
Parts edged with high-pressure laminate without edge processing: 10–12 working days
Facades edged with high-pressure laminate: 10–15 working days
Acrylic facades: 9–11 working days
Parts edged with natural veneer: 10–15 working days
For parts with milling and drilling, the standard production time is extended by 4–5 working days
Aluminum profile facades: 10–15 working days
Sliding door system facades: 10–15 working days